Category Archives: Ideas

Increasing the frequency of the Watford Junction and St Albans Abbey train

There has been talk about increasing the frequency of the Watford and St Albans Abbey trains from their current frequency of every 43 to 60 minutes to every half an hour.  Hertfordshire County Council did an investigation into the costs of installing the frequency to every 30 minutes however the proposal estimates the cost to be around £15-35m.  However there is a way that we could get close to the same performance without any expenditure on a passing loop.

It would be possible to increase the frequency of the trains from Watford to St Albans, and back again, to ever 30 minutes with no infrastructure investment if we make one assumption – that people are happy to get off the train and back on another train – bare with me….

St Albans Abbey Line

Using the existing train timetable to use for the time between each station.  The vast majority of these times are the same all day – the only exceptions being that sometimes trains wait for 5 or 6 minutes at St Albans Abbey before returning and the trains at Watford Junction wait between 6 and 23 minutes before leaving.  To make the math simple I will assume that we wait 6 minutes at both St Albans and Watford Junction stations.

The Hertfordshire County Council proposal was to put a passing loop at Bricket Wood which is 8 minutes from both Watford Junction and from St Albans Abbey.  In this example instead of their being a passing loop one of the trains, we will call Train A, will arrive at Bricket Wood before the other train, Train B – Train A it will terminate at Bricket Wood station after everyone has disembarked.  It will then pull out of the station before Train B arrives, Train B will also terminate at Bricket Wood but will immediately pick up passengers to take them in the reverse direction.  Once Train B has departed Train A will return to collect the passengers looking to complete the remainder of the journey.

The following diagram shows an example with Train A being shown in red and Train B being shown in green.  It should be noted that Train A and Train B will alternate each time because of the train leaving from Bricket Wood earlier the previous time.

St Albans Abbey get of proposal

To be able to turn around a train at Bricket Wood, get it out of the station so the other train can come in then turn the train around again to turn it around a third time there are two variables.  Firstly how long it takes for the train crew to swap over and secondly how long it takes the train to move away from the platform.  To keep things simple we will assume that we can move the train out of the station in 1 minute and back in in 1 minute as well.

The second time, the time it takes the train to turn around (i.e. the train crew to swap ends of the train), this is unknown.  We know that they can do this at St Albans in 5 minutes – but is this 5 minutes also used as a buffer in case the train is delayed?  As such we will look at how the turn around time impacts the average journey duration from Watford Junction to St Albans Abbey where the journey duration is the average time to wait for a train (aka half of the waiting duration) plus the train journey duration.

average-journey-times

(you can see the spreadsheet with the details here in case I’ve made a mistake)

Here we can see if the train turn around time exceeds two minutes then the average journey duration is no better than it is currently of 37 minutes.  If it were possible for the train driver to turn the train around instantly (perhaps because he can drive the train backwards) then the average journey time drops to 28 minutes – which is not far from the 26 minutes which would be achievable if there was a passing loop all without the required £15-35m just with an extra train and passengers happy to briefly get off the train at Bricket Wood – perhaps someone selling coffee on the platform would make them suitably happy for the minor inconvenience.

To highlight, I don’t think this is an end solution to the problem but it might be a good next step so we can increase the frequency of the trains with no major costs and then at a later stage a passing loop could be installed to allow the trains to run directly through and thus removing the swapping over half way.

The London Airport

With the government procrastinating to make any decision after the publication of the Airports Commission: Final Report it seems that there is no apatite for airport expansion by the government.  This is an important issue as highlighted in the report.

At the end of this extensive work programme our conclusions are clear and unanimous. While London remains a well-connected city its airports are showing unambiguous signs of strain. Heathrow is operating at capacity, and Gatwick is quickly approaching the same point. There is still spare capacity elsewhere in the South East for point-to-point and especially low-cost flights, but with no availability at its main hub airport London is beginning to find that new routes to important long-haul destinations are set up elsewhere in Europe rather than in the UK. Other UK airports are increasingly squeezed out of Heathrow, with passengers from the nations and regions obliged to transfer through other European airports, or Middle Eastern hubs. That costs them time and money, and is offputting to inward investors. Without action soon the position will continue to deteriorate, and the entire London system will be full by 2040.

There is, however, an option which the report did not consider – instead of building a new runway why don’t we better connect the ones we have?

A high speed train line linking Gatwick, Heathrow, Luton, Stansted and Southend such that passengers could land at Gatwick and catch a connecting flight from Stansted.  This sounds expensive, but in reality an elevated train line could run most of the route above the M23 and M25 and costs could be further reduces by utilising existing train services from Redhill (to get to Gatwick), St Albans (to get to Luton), Cheshunt (to get to Stansted) and Brentwood (to get to Southend Airport) – though there are some benefits of an airport express service connecting all (or some) of the airports.

The advantage of the airports being connected is that baggage could be transported between airports as well meaning that people would not need to collect their baggage for a connecting flight from a different airport – similar to the Hong Kong system where you can check in in the center of Hong Kong or at Kowloon Station and your baggage is then transported for you to the airport.  In the utopian version of this idea you could go to your closest airport and check in for your flight then take the train round to your actual departing airport, as such each airport now becomes like a terminal to each other – though the take up of this would be airline dependent.  This also has the possibility to transport freight between terminals as well, so that cargo arriving at one airport could easily leave through another.

There are two additional connections which add a very small detour which each add an extra airport.  Woking and Watford.  From Woking you can get to Southampton Airport and from Watford to Birmingham Airport, both Woking to Southampton Airport and Watford Junction to Birmingham International are less than an hours journey.  As well as allowing quick connections for people traveling to Manchester arriving into a London airport via Watford.

M25 Train

A high speed train in the UK can travel at 186mph, if we have the line follow the M23 and M5 it would be, theoretically possible, to get from Gatwick to Heathrow in about 13 minutes, to Luton in about 25 minutes, to Stansted in about 35 minutes and to Southend Airport in about 37 minutes.  So this would link together 7 runways within 40 min and 9 within 1 hour and 20 minutes.  These numbers are overly optimistic, since they do not allow time for people to change trains but with clever scheduling of services that would not add too much time to the journey.

By running the line above the existing motorways it means that we don’t need to buy any more land, we already occupy it.  The technology of elevated trains is nothing new. though based on other elevated trains it might be wise to employ some created architects to make it look amazing!! And much more like…

Nice Elevated Train

and less like…

Elevated Train

Sorry Seattle.

The advantages are:

  • No need to build any extra runway capacity
  • Increased runway utilisation of existing runways
  • Better for the environment (I’ll come back to this one)
  • No need to relocate anyone, the land is already used for public roads

Finally the environmental impact – if we assume that people have to fly the way we can reduce the impact of these people on the environment are by reducing the number of flights either by increasing the size of the plane or by reducing the number of flights to a given destination so that the remaining flights are fuller.  By having better connected airports the number of flights which people can access increases.

As an example there are 45 flights from London airports to Edinburgh on a Monday (randomly chosen day as an example).  12 of these fly from Heathrow and 8 from Gatwick.  If Heathrow and Gatwick were both better connected would all of these flights be needed?  I doubt it.  (The sad fact that flying to Edinburgh is usually cheaper than taking the train I will not dwell on, on this occasion).

BA Flights to Edinburugh

Another environmental improvement would be that if you could check in and drop your bags at your closest airport.  For those people who drive they will not have to drive so far and hopefully not at all by using other public transport.

It might seem a bit odd to be concerned about the environment when talking about air travel, surely this is a juxtaposition.  If a journey has to take place flying in a modern plane is as efficient as taking a very small car for the same journey – but things are moving fast in this area with airplane manufacturers  currently working towards fully electric flight.  As such in the future flying could be powered from renewable energy.

Anyway, lets go back to the train line… If we take this idea one step further and instead of just a single high speed line in each direction we also run a slower stopping line we would be able to provide a way for people to use this on a regular commuting basis – many people already commute using the M25 but they need to have a car as there is no viable train alternative.

Additionally another advantage would be to reduce the number of people who have to travel through the crowded central London network.  This will ease pressure on existing terminus stations and the connecting underground links which are already under strain.

As an example, people traveling from Oxford to Cambridge currently have to change from Paddington to Kings Cross via the underground.

Oxford to Cambridge train

If we include Gerrards Cross and Potters Bar then this line would connect the vast amount of train lines which leave London.

Train Connections

The elephant in the room is that expanding an airport is using private money and building railways is using public money.  Although the costs of an elevated train on already owned land will be cheaper than tunneling a train the costs of which are still likely to be substantial.  Additionally for the service to be as short as possible some of the selected stations do not have sufficient capacity so they will either need to be expanded or new stations build elsewhere allowing customers to transfer between lines.

This post is just to get people thinking, it might be viable or it might not but I do feel that the number of advantages show that this is an idea which should be discussed further.

A poppy of remembrance for London

A letter to the Mayor of London

In 2014 the people of London were very moved by the “Blood Swept Lands and Seas of Red” (aka the poppies at the Tower of London). These poppies represented the number of deaths between the start of the war and those up to 11 November 1914. This was an immensely powerful and though provoking installation and it was a shame when it went – though I can understand it would not have been possible to keep expanding it to cover all of the deaths which occurred until the end of the war in 1918 due to its size.

What I would like to propose is that to mark the centenary of the end of the 1st World War in 2018 that we install a series of red bricks within the pavement to draw out the extent with which the poppies from the Tower of London would have reached, had the installation continued to represent the people who died during the entire first world war. These red bricks would form the broad shape of a poppy when seen on a map. To me they would be something that would remind people about the huge number of people who were killed during the war in a way which is very accessible – since many people per day would walk over them.

I would be very interested to hear your thoughts.

Richard

Tower of London poppies to 1918